Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
650 N IGO WY
Apply Date:
08/22/2023
Applicant:
Tucson Electric Power
Description:
AFTER-THE-FACT: WO T84744. TEP CREW MAD REPAIRS AS A PRIORITY DUE TO WIRES DOWN.

Permit Reviews

Permit Number - TR-UTL-0823-02342
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T84744. TEP CREW MAD REPAIRS AS A PRIORITY DUE TO WIRES DOWN.
Start Date Submittal Complete Date Status  
08/22/2023 RIGHT-OF-WAY REVIEW v.1 08/22/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0823-02342
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T84744. TEP CREW MAD REPAIRS AS A PRIORITY DUE TO WIRES DOWN.
Date Description Comments
08/22/2023 EMERGENCY AFTER THE FACT ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
08/22/2023 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0823-02342
Permit Description: AFTER-THE-FACT: WO T84744. TEP CREW MAD REPAIRS AS A PRIORITY DUE TO WIRES DOWN.
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/27/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/27/2023 TRSP - ROW - Final/Close-Out Passed
11/27/2023 TRSP - ROW - Recurring Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW