Permit: TR-UTL-0823-02342
Permit Details
Apply Date:
08/22/2023
Applicant:
Tucson Electric Power
Description:
AFTER-THE-FACT: WO T84744. TEP CREW MAD REPAIRS AS A PRIORITY DUE TO WIRES DOWN.
Permit Reviews
Permit Number - TR-UTL-0823-02342
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T84744. TEP CREW MAD REPAIRS AS A PRIORITY DUE TO WIRES DOWN.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/22/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/22/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0823-02342
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T84744. TEP CREW MAD REPAIRS AS A PRIORITY DUE TO WIRES DOWN.
Date | Description | Comments |
---|---|---|
08/22/2023 | EMERGENCY AFTER THE FACT ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
08/22/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0823-02342
Permit Description: AFTER-THE-FACT: WO T84744. TEP CREW MAD REPAIRS AS A PRIORITY DUE TO WIRES DOWN.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
11/27/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
11/27/2023 | TRSP - ROW - Recurring | Passed |