Permit: TR-UTL-0823-02333
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5718 E VUELTA DE NUESTRO PUEBLO
Address NEW:
5718 E VUELTA DE NUESTRO PUEBLO
Apply Date:
08/21/2023
Applicant:
Description:
EMG 2623637 5718 E VUELTA DE NUESTRO PUEBLO 15-14-13SW repair service west side of the lot in road; 6lf asphalt; MLM
Permit Reviews
Permit Number - TR-UTL-0823-02333
Permit Status: Complete
Permit Description: EMG 2623637 5718 E VUELTA DE NUESTRO PUEBLO 15-14-13SW repair service west side of the lot in road; 6lf asphalt; MLM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/21/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/22/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0823-02333
Permit Status: Complete
Permit Description: EMG 2623637 5718 E VUELTA DE NUESTRO PUEBLO 15-14-13SW repair service west side of the lot in road; 6lf asphalt; MLM
| Date | Description | Comments |
|---|---|---|
| 08/22/2023 | EMERGENCY AFTER THE FACT ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 08/22/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0823-02333
Permite Description: EMG 2623637 5718 E VUELTA DE NUESTRO PUEBLO 15-14-13SW repair service west side of the lot in road; 6lf asphalt; MLM
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0823-02333
Permit Description: EMG 2623637 5718 E VUELTA DE NUESTRO PUEBLO 15-14-13SW repair service west side of the lot in road; 6lf asphalt; MLM
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/18/2023 | TRSP - ROW - Final/Close-Out | Passed |