Permit: TR-UTL-0823-02310
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
739 E WAVERLY ST
Address NEW:
739 E WAVERLY ST
Apply Date:
08/17/2023
Applicant:
Description:
EMG 2624278 739 E WAVERLY ST 14-14-06NW repair service front south side of address; 6lf asphalt/ MLM
Permit Reviews
Permit Number - TR-UTL-0823-02310
Permit Status: Complete
Permit Description: EMG 2624278 739 E WAVERLY ST 14-14-06NW repair service front south side of address; 6lf asphalt/ MLM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/18/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/18/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0823-02310
Permit Status: Complete
Permit Description: EMG 2624278 739 E WAVERLY ST 14-14-06NW repair service front south side of address; 6lf asphalt/ MLM
| Date | Description | Comments |
|---|---|---|
| 08/18/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 08/18/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0823-02310
Permit Description: EMG 2624278 739 E WAVERLY ST 14-14-06NW repair service front south side of address; 6lf asphalt/ MLM
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/11/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/11/2024 | TRSP - ROW - Recurring | Passed |