Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2425 N ORACLE RD
Apply Date:
08/10/2023
Applicant:
Jamie Hoyt
Description:
EXCAVATE (4) 5'X5' BELL HOLES IN ASPHALT ROW/EASEMENT IN ORDER FOR GAS SERVICE REPLACEMENTS.

Permit Reviews

Permit Number - TR-UTL-0823-02241
Permit Status: Complete
Permit Description: EXCAVATE (4) 5'X5' BELL HOLES IN ASPHALT ROW/EASEMENT IN ORDER FOR GAS SERVICE REPLACEMENTS.
Start Date Submittal Complete Date Status  
08/10/2023 RIGHT-OF-WAY REVIEW v.1 08/15/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0823-02241
Permit Status: Complete
Permit Description: EXCAVATE (4) 5'X5' BELL HOLES IN ASPHALT ROW/EASEMENT IN ORDER FOR GAS SERVICE REPLACEMENTS.
Date Description Comments
08/10/2023 * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
08/10/2023 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0823-02241
Permit Description: EXCAVATE (4) 5'X5' BELL HOLES IN ASPHALT ROW/EASEMENT IN ORDER FOR GAS SERVICE REPLACEMENTS.
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/26/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/26/2023 TRSP - ROW - Final/Close-Out Passed
09/26/2023 TRSP - ROW - Recurring Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
ARIZONA PIPELINE - 2425 N ORACLE RD - RIGHT LANE PLAN 1 - PENDING_V1.PDF DOCUMENTS VIEW
ARIZONA PIPELINE - 2425 N ORACLE RD - SHIFT TO NORTH ON ALTURAS PLAN 2 - PENDING_V1.PDF DOCUMENTS VIEW
ARIZONA PIPELINE - 2425 N ORACLE RD - SHIFT TO SOUTH ON ALTURAS PLAN 3 - PENDING_V1.PDF DOCUMENTS VIEW
SITE PLAN FOR 2425, 2437, 2445 N ORACLE RD (3)_V1.PDF DOCUMENTS VIEW