Permit: TR-UTL-0823-02218
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
723 E 22ND ST
Address NEW:
723 E 22ND ST
Apply Date:
08/07/2023
Applicant:
Gloria Salmeron
Description:
CONTINUATION TO PERMIT NUMBER TR-UTL-0323-00994. GAS MAIN AND SERVICE REPLACEMENT FOR 22ND ST OVERLAY PROJECT
Permit Reviews
Permit Number - TR-UTL-0823-02218
Permit Status: Complete
Permit Description: CONTINUATION TO PERMIT NUMBER TR-UTL-0323-00994. GAS MAIN AND SERVICE REPLACEMENT FOR 22ND ST OVERLAY PROJECT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2023 | RIGHT-OF-WAY REVIEW v.2 | 08/23/2023 | APPROVED |
| 08/16/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/22/2023 | REQUIRES RESUBMIT |
| 08/16/2023 | RIGHT-OF-WAY REVIEW v.2 | 08/16/2023 | APPROVED |
| 08/07/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/15/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TR-UTL-0823-02218
Permit Status: Complete
Permit Description: CONTINUATION TO PERMIT NUMBER TR-UTL-0323-00994. GAS MAIN AND SERVICE REPLACEMENT FOR 22ND ST OVERLAY PROJECT
| Date | Description | Comments |
|---|---|---|
| 08/07/2023 | * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 08/07/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0823-02218
Permit Description: CONTINUATION TO PERMIT NUMBER TR-UTL-0323-00994. GAS MAIN AND SERVICE REPLACEMENT FOR 22ND ST OVERLAY PROJECT
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/31/2025 | TRSP - ROW - Final/Close-Out | Passed |