Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
5729 E 22ND ST
Address NEW:
5729 E 22ND ST
Apply Date:
07/31/2026
Applicant:
Arnulfo Quiroz
Description:
WO T26146. CONVERT 26 SPANS OF OVERHEAD AND 1 RUN OF UNDERGROUND DISTRIBUTION FROM 4kV to 13.8kV. REPLACE 21 POLE-TYPE TRANSFORMERS WITH 7970 V. REPLACE 1 THREE-PHASE PAD-MOUNTED TRANSFORMER WITH 13.8kV. INSTALL A 1500 kVA CONVERSION BANK. ACTIVE WORKING DAYS: 60 DAYS. TCP DURING WORKING HOURS. 10/19/26- Renew permit for 30 days as of 10/23/26 new expiration date is 11/22/26

Permit Reviews

Permit Number - TR-UTL-0726-01275
Permit Status: Inspections
Permit Description: WO T26146. CONVERT 26 SPANS OF OVERHEAD AND 1 RUN OF UNDERGROUND DISTRIBUTION FROM 4kV to 13.8kV. REPLACE 21 POLE-TYPE TRANSFORMERS WITH 7970 V. REPLACE 1 THREE-PHASE PAD-MOUNTED TRANSFORMER WITH 13.8kV. INSTALL A 1500 kVA CONVERSION BANK. ACTIVE WORKING DAYS: 60 DAYS. TCP DURING WORKING HOURS. 10/19/26- Renew permit for 30 days as of 10/23/26 new expiration date is 11/22/26
Start Date Submittal Complete Date Status  
07/31/2026 RIGHT-OF-WAY REVIEW v.1 07/31/2026 REQUIRES RESUBMIT Review Details
08/05/2026 RIGHT-OF-WAY REVIEW v.2 08/07/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01275
Permit Status: Inspections
Permit Description: WO T26146. CONVERT 26 SPANS OF OVERHEAD AND 1 RUN OF UNDERGROUND DISTRIBUTION FROM 4kV to 13.8kV. REPLACE 21 POLE-TYPE TRANSFORMERS WITH 7970 V. REPLACE 1 THREE-PHASE PAD-MOUNTED TRANSFORMER WITH 13.8kV. INSTALL A 1500 kVA CONVERSION BANK. ACTIVE WORKING DAYS: 60 DAYS. TCP DURING WORKING HOURS. 10/19/26- Renew permit for 30 days as of 10/23/26 new expiration date is 11/22/26
Total Outstanding Activity Conditions - 4
Date Name
07/31/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
07/31/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
07/31/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
07/31/2026 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0726-01275
Permite Description: WO T26146. CONVERT 26 SPANS OF OVERHEAD AND 1 RUN OF UNDERGROUND DISTRIBUTION FROM 4kV to 13.8kV. REPLACE 21 POLE-TYPE TRANSFORMERS WITH 7970 V. REPLACE 1 THREE-PHASE PAD-MOUNTED TRANSFORMER WITH 13.8kV. INSTALL A 1500 kVA CONVERSION BANK. ACTIVE WORKING DAYS: 60 DAYS. TCP DURING WORKING HOURS. 10/19/26- Renew permit for 30 days as of 10/23/26 new expiration date is 11/22/26
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/22/2026 TRSP - ROW - Barricade - Setup/Routine N/A Partial Pass
10/22/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
10/22/2026 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0726-01275
Permit Description: WO T26146. CONVERT 26 SPANS OF OVERHEAD AND 1 RUN OF UNDERGROUND DISTRIBUTION FROM 4kV to 13.8kV. REPLACE 21 POLE-TYPE TRANSFORMERS WITH 7970 V. REPLACE 1 THREE-PHASE PAD-MOUNTED TRANSFORMER WITH 13.8kV. INSTALL A 1500 kVA CONVERSION BANK. ACTIVE WORKING DAYS: 60 DAYS. TCP DURING WORKING HOURS. 10/19/26- Renew permit for 30 days as of 10/23/26 new expiration date is 11/22/26
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/28/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Scheduled Inspections

Scheduled Inspections - TR-UTL-0726-01275
Status: Inspections
Description: WO T26146. CONVERT 26 SPANS OF OVERHEAD AND 1 RUN OF UNDERGROUND DISTRIBUTION FROM 4kV to 13.8kV. REPLACE 21 POLE-TYPE TRANSFORMERS WITH 7970 V. REPLACE 1 THREE-PHASE PAD-MOUNTED TRANSFORMER WITH 13.8kV. INSTALL A 1500 kVA CONVERSION BANK. ACTIVE WORKING DAYS: 60 DAYS. TCP DURING WORKING HOURS. 10/19/26- Renew permit for 30 days as of 10/23/26 new expiration date is 11/22/26
Scheduled Date Description Entered By Entered Date
11/23/2026 TRSP - ROW - Barricade - Setup/Routine Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
REVISED TCP - DB 72838 - 5729 E 22ND ST - VARIOUS - T26146_V1.PDF DOCUMENTS VIEW
T26146_AERIALPERMITMAP_V1.PDF DOCUMENTS VIEW