Permit: TR-UTL-0726-01266
Permit Details
Status:
Approved
Type:
Right-of-Way (ROW) - Utility
Address:
1202 S PALO VERDE AV
Address NEW:
1202 S PALO VERDE AV
Apply Date:
07/29/2026
Applicant:
Ilana Galluzzo
Description:
CONTINUATION PERMIT FOR TR-UTL-1125-01951 SET TO EXPIRE 8/11/26. SYSTEM REINFORCEMENT PROJECT FOR REID PARK ZOO AREA, INSTALLING 1,161FT TOTAL OF 2" PE, WITH A TOTAL OF 330FT CROSSING 22ND STREET RIGHT-OF-WAY. ENTIRE DISTANCE WILL BE BORED, WITH 4; 5X5FT BORE LAUNCH & RETRIEVE HOLES, INCLUDING TIE IN. APPROX 11.11 TOTAL SQUARE YARDAGE. PLEASE CARRY OVER ALL CONDITIONS FROM PREVIOUS PERMIT.
Permit Reviews
Permit Number - TR-UTL-0726-01266
Permit Status: Approved
Permit Description: CONTINUATION PERMIT FOR TR-UTL-1125-01951 SET TO EXPIRE 8/11/26.
SYSTEM REINFORCEMENT PROJECT FOR REID PARK ZOO AREA, INSTALLING 1,161FT TOTAL OF 2" PE, WITH A TOTAL OF 330FT CROSSING 22ND STREET RIGHT-OF-WAY.
ENTIRE DISTANCE WILL BE BORED, WITH 4; 5X5FT BORE LAUNCH & RETRIEVE HOLES, INCLUDING TIE IN. APPROX 11.11 TOTAL SQUARE YARDAGE.
PLEASE CARRY OVER ALL CONDITIONS FROM PREVIOUS PERMIT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/30/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/12/2026 | REQUIRES RESUBMIT |
| 08/12/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/17/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01266
Permit Status: Approved
Permit Description: CONTINUATION PERMIT FOR TR-UTL-1125-01951 SET TO EXPIRE 8/11/26.
SYSTEM REINFORCEMENT PROJECT FOR REID PARK ZOO AREA, INSTALLING 1,161FT TOTAL OF 2" PE, WITH A TOTAL OF 330FT CROSSING 22ND STREET RIGHT-OF-WAY.
ENTIRE DISTANCE WILL BE BORED, WITH 4; 5X5FT BORE LAUNCH & RETRIEVE HOLES, INCLUDING TIE IN. APPROX 11.11 TOTAL SQUARE YARDAGE.
PLEASE CARRY OVER ALL CONDITIONS FROM PREVIOUS PERMIT.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 07/31/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/31/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/31/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 07/31/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/13/2026 | Excavation - All excavations shall be secured for safety at the end of each shift. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet must be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift |
| 08/13/2026 | Pavement Restoration - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
| 08/13/2026 | Survey Monument – If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
| 08/13/2026 | Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |