Permit: TR-UTL-0726-01261
Permit Details
Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3901 E WHITTIER ST
Address NEW:
3901 E WHITTIER ST
Apply Date:
07/29/2026
Applicant:
Angeline Trejo
Description:
Place one 3048 handhole; bore 210’ and place fiber cable and innerduct; access one Manhole for placing and splicing fiber cable. This project if for Lumen and will not be conveyed to any other company.
Permit Reviews
Permit Number - TR-UTL-0726-01261
Permit Status: Inspections complete
Permit Description: Place one 3048 handhole; bore 210’ and place fiber cable and innerduct; access one Manhole for placing and splicing fiber cable. This project if for Lumen and will not be conveyed to any other company.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/13/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/13/2026 | APPROVED |
| 07/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/12/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01261
Permit Status: Inspections complete
Permit Description: Place one 3048 handhole; bore 210’ and place fiber cable and innerduct; access one Manhole for placing and splicing fiber cable. This project if for Lumen and will not be conveyed to any other company.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 07/30/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/30/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/30/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/30/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/30/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/13/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 08/13/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 08/13/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 08/13/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-UTL-0726-01261
Permit Description: Place one 3048 handhole; bore 210’ and place fiber cable and innerduct; access one Manhole for placing and splicing fiber cable. This project if for Lumen and will not be conveyed to any other company.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/16/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/16/2026 | TRSP - ROW - Final | Passed |