Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address NEW:
380 E FORT LOWELL RD
Apply Date:
07/28/2026
Applicant:
Manuel Diaz Jr
Description:
Installing fiber optic conduit

Permit Reviews

Permit Number - TR-UTL-0726-01248
Permit Status: In review
Permit Description: Installing fiber optic conduit
Start Date Submittal Complete Date Status  
07/28/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01248
Permit Status: In review
Permit Description: Installing fiber optic conduit
Total Outstanding Activity Conditions - 6
Date Name
08/06/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
08/06/2026 Traffic control set-up approved between 9AM - 3:30PM
08/06/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/06/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
08/06/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/06/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.