Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
719 S 4TH AV
Address NEW:
719 S 4TH AV
Apply Date:
07/27/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 719 S 4TH AVE

Permit Reviews

Permit Number - TR-UTL-0726-01241
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 719 S 4TH AVE
Start Date Submittal Complete Date Status  
07/28/2026 RIGHT-OF-WAY REVIEW v.1 07/31/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01241
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 719 S 4TH AVE
Total Outstanding Activity Conditions - 8
Date Name
07/28/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
07/28/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/31/2026 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
07/31/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
07/31/2026 Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post.
07/31/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/31/2026 Standard Comments – Recent Review Process Updates The following information is required for all permits submitted under the updated City review process: 1. Permit Application: Include the total number of Active ROW (Right-of-Way) impact days for each closure type and location (e.g., right lane, left lane, bike lane, sidewalk, turn bay, etc.). In addition to the overall permit length in the Work Duration Section. 2. Construction / Design Plans / Site Plan: When pavement cuts are proposed, identify the total square yardage of each pavement cuts in the Work Detail section of the permit application and on the applicable design, site, or construction plans, and call out the location of Bore Pits (with dimension) , Trenches, and Aerial work. 3. Traffic Control Plan (TCP): The TCP shall include: o Total number of Active ROW impact workdays for each Closure and Closure Type when multiple closure will be used within the project. o Total closure length, including:  Taper length  Buffer space length  Work area length  Return taper length  Bike Lane closure length if different than overall TC closure  Pedestrian Detour Route – if different than overall TC closure  Plan to call out all Bus Stops and how they are address with in TC closure o Work hours based on the applicable ROW closure type. o All other required traffic control details and work area information necessary to clearly define the proposed impacts. o Plans should note or take into consideration type of work and associate Equipment that will be placed (Ex. Bore line at back of Sidewalk will require Bore Drill placement on Sidewalk, work trucks park in ROW when work maybe behind curb line, or Aerial Bucket trucks placement). Note: This information shall be included with all permit applications moving forward to comply with the City's updated review process and current Permit Fee Schedule
07/31/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0726-01241
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 719 S 4TH AVE
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/05/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
719 S 4TH AV SITE_V1.PDF DOCUMENTS VIEW
719 S 4TH AV TCP_V1.PDF DOCUMENTS VIEW