Permit: TR-UTL-0726-01239
Permit Details
Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4501 E 12TH ST
Address NEW:
4501 E 12TH ST
Apply Date:
07/24/2026
Applicant:
Angeline Trejo
Description:
ACCESS TO MH-14209 & HH-14518 TO SPLICE. THIS PROJECT IS FOR LUMEN AND WILL NOT BE CONVEYED TO ANY OTHER COMPANY. Access MH-14209 and HH-14518 to splice fiber and pull new fiber through existing path between MH & HH. This project is for Lumen and will not be conveyed to any other company
Permit Reviews
Permit Number - TR-UTL-0726-01239
Permit Status: Inspections complete
Permit Description: ACCESS TO MH-14209 & HH-14518 TO SPLICE. THIS PROJECT IS FOR LUMEN AND WILL NOT BE CONVEYED TO ANY OTHER COMPANY.
Access MH-14209 and HH-14518 to splice fiber and pull new fiber through existing path
between MH & HH. This project is for Lumen and will not be conveyed to any other company
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/18/2026 | APPROVED |
| 08/24/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01239
Permit Status: Inspections complete
Permit Description: ACCESS TO MH-14209 & HH-14518 TO SPLICE. THIS PROJECT IS FOR LUMEN AND WILL NOT BE CONVEYED TO ANY OTHER COMPANY.
Access MH-14209 and HH-14518 to splice fiber and pull new fiber through existing path
between MH & HH. This project is for Lumen and will not be conveyed to any other company
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/27/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/27/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 07/27/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/27/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/28/2026 | Standard Comments – Recent Review Process Updates The following information is required for all permits submitted under the updated City review process: 1. Permit Application: Include the total number of Active ROW (Right-of-Way) impact days for each closure type and location (e.g., right lane, left lane, bike lane, sidewalk, turn bay, etc.). In addition to the overall permit length in the Work Duration Section. 2. Construction / Design Plans / Site Plan: When pavement cuts are proposed, identify the total square yardage of each pavement cuts in the Work Detail section of the permit application and on the applicable design, site, or construction plans, and call out the location of Bore Pits (with dimension) , Trenches, and Aerial work. 3. Traffic Control Plan (TCP): The TCP shall include: o Total number of Active ROW impact workdays for each Closure and Closure Type when multiple closure will be used within the project. o Total closure length, including: Taper length Buffer space length Work area length Return taper length Bike Lane closure length if different than overall TC closure Pedestrian Detour Route – if different than overall TC closure Plan to call out all Bus Stops and how they are address with in TC closure o Work hours based on the applicable ROW closure type. o All other required traffic control details and work area information necessary to clearly define the proposed impacts. o Plans should note or take into consideration type of work and associate Equipment that will be placed (Ex. Bore line at back of Sidewalk will require Bore Drill placement on Sidewalk, work trucks park in ROW when work maybe behind curb line, or Aerial Bucket trucks placement). Note: This information shall be included with all permit applications moving forward to comply with the City's updated review process and current Permit Fee Schedule. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-UTL-0726-01239
Permit Description: ACCESS TO MH-14209 & HH-14518 TO SPLICE. THIS PROJECT IS FOR LUMEN AND WILL NOT BE CONVEYED TO ANY OTHER COMPANY.
Access MH-14209 and HH-14518 to splice fiber and pull new fiber through existing path
between MH & HH. This project is for Lumen and will not be conveyed to any other company
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/20/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/20/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/20/2026 | TRSP - ROW - Final | Passed |