Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Apply Date:
07/23/2026
Applicant:
ANGEL MORALES
Description:
wo#3332089 1798 N. Silver Mountain Pl. 14-13-3 ne renew HDPE service line at the front southwest corner of the lot in asphalt 4lf/ar

Permit Reviews

Permit Number - TR-UTL-0726-01229
Permit Status: Needs resubmittal
Permit Description: wo#3332089 1798 N. Silver Mountain Pl. 14-13-3 ne renew HDPE service line at the front southwest corner of the lot in asphalt 4lf/ar
Start Date Submittal Complete Date Status  
07/23/2026 RIGHT-OF-WAY REVIEW v.1 08/12/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01229
Permit Status: Needs resubmittal
Permit Description: wo#3332089 1798 N. Silver Mountain Pl. 14-13-3 ne renew HDPE service line at the front southwest corner of the lot in asphalt 4lf/ar
Total Outstanding Activity Conditions - 4
Date Name
07/28/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/28/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/28/2026 Traffic Control set-up approved between 7AM - 5PM
07/28/2026 LANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. ** PAVEMENT PATCH TYPE SHAL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL