Permit: TR-UTL-0726-01227
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
5118 E 29TH ST
Address NEW:
5118 E 29TH ST
Apply Date:
07/23/2026
Applicant:
ANGEL MORALES
Description:
wo#3318370 5118 e. 29th st 14-14-23 se remove and replace leaking curbstop at the north side of the lot in concrete 7lf/ar
Permit Reviews
Permit Number - TR-UTL-0726-01227
Permit Status: Needs resubmittal
Permit Description: wo#3318370 5118 e. 29th st 14-14-23 se remove and replace leaking curbstop at the north side of the lot in concrete 7lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/23/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/28/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01227
Permit Status: Needs resubmittal
Permit Description: wo#3318370 5118 e. 29th st 14-14-23 se remove and replace leaking curbstop at the north side of the lot in concrete 7lf/ar
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/28/2026 | CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 07/28/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/28/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/28/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/28/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |