Permit: TR-UTL-0726-01223
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
48 N TUCSON BL
Address NEW:
48 N TUCSON BL
Apply Date:
07/23/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1-5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0726-01223
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1-5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/23/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01223
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1-5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/27/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 07/27/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/27/2026 | Standard Comments – Recent Review Process Updates The following information is required for all permits submitted under the updated City review process: 1. Permit Application: Include the total number of Active ROW (Right-of-Way) impact days for each closure type and location (e.g., right lane, left lane, bike lane, sidewalk, turn bay, etc.). In addition to the overall permit length in the Work Duration Section. 2. Construction / Design Plans / Site Plan: When pavement cuts are proposed, identify the total square yardage of each pavement cuts in the Work Detail section of the permit application and on the applicable design, site, or construction plans, and call out the location of Bore Pits (with dimension) , Trenches, and Aerial work. 3. Traffic Control Plan (TCP): The TCP shall include: o Total number of Active ROW impact workdays for each Closure and Closure Type when multiple closure will be used within the project. o Total closure length, including: Taper length Buffer space length Work area length Return taper length Bike Lane closure length if different than overall TC closure Pedestrian Detour Route – if different than overall TC closure Plan to call out all Bus Stops and how they are address with in TC closure o Work hours based on the applicable ROW closure type. o All other required traffic control details and work area information necessary to clearly define the proposed impacts. o Plans should note or take into consideration type of work and associate Equipment that will be placed (Ex. Bore line at back of Sidewalk will require Bore Drill placement on Sidewalk, work trucks park in ROW when work maybe behind curb line, or Aerial Bucket trucks placement). Note: This information shall be included with all permit applications moving forward to comply with the City's updated review process and current Permit Fee Schedule. |
| 07/27/2026 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0726-01223
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1-5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0726-01223
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1-5'X5' BELL HOLE IN ASPHALT ROW IN ORDER TO ABANDON GAS SERVICE
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/10/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed |