Permit: TR-UTL-0726-01217
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
6667 S TUCSON BL
Address NEW:
6667 S TUCSON BL
Apply Date:
07/22/2026
Applicant:
Description:
wo#3314963 6667 s tucson bl 17-15-14 ne hydrant replacement at the southeast corner of the lot in dirt and asphalt 6lf/ar
Permit Reviews
Permit Number - TR-UTL-0726-01217
Permit Status: Inspections
Permit Description: wo#3314963 6667 s tucson bl 17-15-14 ne hydrant replacement at the southeast corner of the lot in dirt and asphalt 6lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/12/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01217
Permit Status: Inspections
Permit Description: wo#3314963 6667 s tucson bl 17-15-14 ne hydrant replacement at the southeast corner of the lot in dirt and asphalt 6lf/ar
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 07/24/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 07/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/24/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0726-01217
Permite Description: wo#3314963 6667 s tucson bl 17-15-14 ne hydrant replacement at the southeast corner of the lot in dirt and asphalt 6lf/ar
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| TRSP - ROW - Final | N/A | Requested |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0726-01217
Permit Description: wo#3314963 6667 s tucson bl 17-15-14 ne hydrant replacement at the southeast corner of the lot in dirt and asphalt 6lf/ar
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/13/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |