Permit: TR-UTL-0726-01212
Permit Details
Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Utility
Address:
120 S SWAN RD
Address NEW:
120 S SWAN RD
Apply Date:
07/22/2026
Applicant:
Cox Communications
Description:
PRJ319379-1: Cox to overlash 365' of new CATV fiber to existing strand, then continue onto private property for system tie.
Permit Reviews
Permit Number - TR-UTL-0726-01212
Permit Status: Inspections complete
Permit Description: PRJ319379-1: Cox to overlash 365' of new CATV fiber to existing strand, then continue onto private property for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/28/2026 | REQUIRES RESUBMIT |
| 08/11/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/12/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01212
Permit Status: Inspections complete
Permit Description: PRJ319379-1: Cox to overlash 365' of new CATV fiber to existing strand, then continue onto private property for system tie.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/24/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 07/24/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/12/2026 | Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-UTL-0726-01212
Permit Description: PRJ319379-1: Cox to overlash 365' of new CATV fiber to existing strand, then continue onto private property for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/21/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/21/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/26/2026 | TRSP - ROW - Final | Passed |