Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7554 S LA PALMA CT
Apply Date:
07/21/2026
Applicant:
Description:
wo#3315725 7554 s. la palma ct 15-15-22 se renew hdpe leaking service line at the front southeast corner of the lot in asphalt 8lf/ar

Permit Reviews

Permit Number - TR-UTL-0726-01203
Permit Status: Issued
Permit Description: wo#3315725 7554 s. la palma ct 15-15-22 se renew hdpe leaking service line at the front southeast corner of the lot in asphalt 8lf/ar
Start Date Submittal Complete Date Status  
07/22/2026 RIGHT-OF-WAY REVIEW v.1 08/16/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01203
Permit Status: Issued
Permit Description: wo#3315725 7554 s. la palma ct 15-15-22 se renew hdpe leaking service line at the front southeast corner of the lot in asphalt 8lf/ar
Total Outstanding Activity Conditions - 4
Date Name
07/22/2026 Traffic Control set-up approved between 7AM - 5PM
07/22/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
08/14/2026 All excavations shall be secured for safety at the end of each shift. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet must be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift
08/14/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period