Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address NEW:
766 W SANTA PAULA ST
Apply Date:
07/21/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Mission Manor Phase 1D main replacement. Approx 4092 LF of 6" DIP water main install with 67 new water services and meters 10/20/2026 - Request for 30 Day Renewal as of 10/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0726-01201
Permit Status: Issued
Permit Description: Mission Manor Phase 1D main replacement. Approx 4092 LF of 6" DIP water main install with 67 new water services and meters 10/20/2026 - Request for 30 Day Renewal as of 10/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
07/21/2026 RIGHT-OF-WAY REVIEW v.1 07/28/2026 REQUIRES RESUBMIT Review Details
08/16/2026 RIGHT-OF-WAY REVIEW v.2 08/20/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01201
Permit Status: Issued
Permit Description: Mission Manor Phase 1D main replacement. Approx 4092 LF of 6" DIP water main install with 67 new water services and meters 10/20/2026 - Request for 30 Day Renewal as of 10/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 7
Date Name
07/24/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
07/24/2026 Traffic control set-up approved between 9AM - 3:30PM
07/24/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/20/2026 Excavation - All excavations shall be secured for safety at the end of each shift. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet must be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift
08/20/2026 Fire Station - The contractor shall coordinate with the nearby fire station prior to implementing any road closures or traffic control that may impact emergency access. The contractor shall maintain access for emergency vehicles at all times when working near fire stations, hospitals, or emergency response routes. The contractor shall notify the fire station a minimum of 48 hours prior to the start of work and coordinate any necessary accommodations to ensure emergency response is not delayed..
08/20/2026 Neighborhood work - The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary
08/20/2026 Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk.

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-UTL-0726-01201
Permite Description: Mission Manor Phase 1D main replacement. Approx 4092 LF of 6" DIP water main install with 67 new water services and meters 10/20/2026 - Request for 30 Day Renewal as of 10/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Barricade - Setup/Routine N/A Scheduled
TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Requested
TRSP - ROW - Backfill - Placement/Compaction N/A Requested
TRSP - ROW - Final N/A Requested

Scheduled Inspections

Scheduled Inspections - TR-UTL-0726-01201
Status: Issued
Description: Mission Manor Phase 1D main replacement. Approx 4092 LF of 6" DIP water main install with 67 new water services and meters 10/20/2026 - Request for 30 Day Renewal as of 10/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Scheduled Date Description Entered By Entered Date
10/30/2026 TRSP - ROW - Barricade - Setup/Routine Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
MISSION MANOR MAIN PH1D-4R-MODEL_V2.PDF DOCUMENTS VIEW
2026.02.16_MISSION MANOR 1D 100 SUBMITTAL_V1.PDF DOCUMENTS VIEW
MISSION MANOR MAIN PH1D-1-MODEL_V1.PDF DOCUMENTS VIEW
MISSION MANOR MAIN PH1D-2-MODEL_V1.PDF DOCUMENTS VIEW
MISSION MANOR MAIN PH1D-5-MODEL_V1.PDF DOCUMENTS VIEW
MISSION MANOR MAIN PH1D-6-MODEL_V1.PDF DOCUMENTS VIEW