Permit Details

Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3411 S MORMON DR
Address NEW:
3411 S MORMON DR
Apply Date:
07/20/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
bates paving will be paving at 3441 s camino seco on dates 7/20-7/24 and on 7/27-7/31

Permit Reviews

Permit Number - TR-UTL-0726-01193
Permit Status: Inspections complete
Permit Description: bates paving will be paving at 3441 s camino seco on dates 7/20-7/24 and on 7/27-7/31
Start Date Submittal Complete Date Status  
07/20/2026 RIGHT-OF-WAY REVIEW v.1 07/23/2026 REQUIRES RESUBMIT Review Details
07/28/2026 RIGHT-OF-WAY REVIEW v.2 07/29/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01193
Permit Status: Inspections complete
Permit Description: bates paving will be paving at 3441 s camino seco on dates 7/20-7/24 and on 7/27-7/31
Total Outstanding Activity Conditions - 4
Date Name
07/22/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
07/22/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
07/22/2026 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
07/22/2026 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TR-UTL-0726-01193
Permit Description: bates paving will be paving at 3441 s camino seco on dates 7/20-7/24 and on 7/27-7/31
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/03/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Orlando, who had already spoken with Jeff previously for this job, project has been completed
09/29/2026 TRSP - ROW - Barricade - Setup/Routine Passed all work completed, traffic control devices removed from site
09/29/2026 TRSP - ROW - Backfill - Placement/Compaction Passed paving is completed with tack connections to right of way roadway
09/29/2026 TRSP - ROW - Final Passed New paving has been completed with all devices and debris removed from site, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
BATES 3411 S CAMINO SECO-2-MODEL_V1.PDF DOCUMENTS VIEW
BATES RINCON COUNTRY 3441 S CAMINO SECO TCP 1-A-MODEL_V2.PDF DOCUMENTS VIEW
RINCON COUNTRY MHP PAVE MAP WORK SITE_V1.PDF DOCUMENTS VIEW