Permit: TR-UTL-0726-01193
Permit Details
Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3411 S MORMON DR
Address NEW:
3411 S MORMON DR
Apply Date:
07/20/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
bates paving will be paving at 3441 s camino seco on dates 7/20-7/24 and on 7/27-7/31
Permit Reviews
Permit Number - TR-UTL-0726-01193
Permit Status: Inspections complete
Permit Description: bates paving will be paving at 3441 s camino seco on dates 7/20-7/24
and on 7/27-7/31
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/23/2026 | REQUIRES RESUBMIT |
| 07/28/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/29/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01193
Permit Status: Inspections complete
Permit Description: bates paving will be paving at 3441 s camino seco on dates 7/20-7/24
and on 7/27-7/31
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/22/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/22/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 07/22/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 07/22/2026 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-UTL-0726-01193
Permit Description: bates paving will be paving at 3441 s camino seco on dates 7/20-7/24
and on 7/27-7/31
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Orlando, who had already spoken with Jeff previously for this job, project has been completed | |
| 09/29/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | all work completed, traffic control devices removed from site | |
| 09/29/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | paving is completed with tack connections to right of way roadway | |
| 09/29/2026 | TRSP - ROW - Final | Passed | New paving has been completed with all devices and debris removed from site, approved |