Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
2500 E 22ND ST
Address NEW:
2500 E 22ND ST
Apply Date:
07/17/2026
Applicant:
Cox Communications
Description:
PRJ319431-1: Cox to pull thru 85' of existing CATV fiber in ROW, then continue onto private property for system tie.

Permit Reviews

Permit Number - TR-UTL-0726-01190
Permit Status: Issued
Permit Description: PRJ319431-1: Cox to pull thru 85' of existing CATV fiber in ROW, then continue onto private property for system tie.
Start Date Submittal Complete Date Status  
07/17/2026 RIGHT-OF-WAY REVIEW v.1 07/27/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01190
Permit Status: Issued
Permit Description: PRJ319431-1: Cox to pull thru 85' of existing CATV fiber in ROW, then continue onto private property for system tie.
Total Outstanding Activity Conditions - 6
Date Name
07/20/2026 Traffic Control set-up approved between 7AM - 5PM
07/24/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
07/24/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/24/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
07/24/2026 Refer to Attachments for Loss of Use Estimate.
07/24/2026 Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, § 1, 10-19-64)

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PRJ319431-1 TCP_V1.PDF DOCUMENTS VIEW
PRJ319431-1 TUCSON_V1.PDF DOCUMENTS VIEW