Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
862 W GLENN ST
Address NEW:
862 W GLENN ST
Apply Date:
07/17/2026
Applicant:
ANGEL MORALES
Description:
P.348986E Overbuild Bore 2179' and trench 377' to place conduit and fiber cable Place 1706' of aerial fiber cable Place 38 pedestals/cabinets/vaults

Permit Reviews

Permit Number - TR-UTL-0726-01188
Permit Status: Needs resubmittal
Permit Description: P.348986E Overbuild Bore 2179' and trench 377' to place conduit and fiber cable Place 1706' of aerial fiber cable Place 38 pedestals/cabinets/vaults
Start Date Submittal Complete Date Status  
07/17/2026 RIGHT-OF-WAY REVIEW v.1 08/06/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01188
Permit Status: Needs resubmittal
Permit Description: P.348986E Overbuild Bore 2179' and trench 377' to place conduit and fiber cable Place 1706' of aerial fiber cable Place 38 pedestals/cabinets/vaults
Total Outstanding Activity Conditions - 9
Date Name
07/21/2026 Traffic control set-up approved between 9AM - 3:30PM
07/21/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/21/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
07/21/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/21/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/21/2026 Please see attachments for storm to shade conditions.
07/23/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
07/23/2026 E. Calle Arizona is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting.
07/23/2026 N. 15th Av is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting.