Permit: TR-UTL-0726-01186
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
710 W ALTURAS ST
Address NEW:
710 W ALTURAS ST
Apply Date:
07/17/2026
Applicant:
ANGEL MORALES
Description:
P.348986C Overbuild Bore 147' and trench 58' to place conduit and fiber cable Place 3713' of aerial fiber cable Place 2 pedestals/cabinets/vaults
Permit Reviews
Permit Number - TR-UTL-0726-01186
Permit Status: Fees due
Permit Description: P.348986C Overbuild
Bore 147' and trench 58' to place conduit and fiber cable
Place 3713' of aerial fiber cable
Place 2 pedestals/cabinets/vaults
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/28/2026 | REQUIRES RESUBMIT |
| 08/27/2026 | RIGHT-OF-WAY REVIEW v.2 | 09/21/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01186
Permit Status: Fees due
Permit Description: P.348986C Overbuild
Bore 147' and trench 58' to place conduit and fiber cable
Place 3713' of aerial fiber cable
Place 2 pedestals/cabinets/vaults
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/17/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/17/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 07/17/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/17/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |