Permit: TR-UTL-0726-01178
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
5462 E GLENN ST
Address NEW:
5462 E GLENN ST
Apply Date:
07/16/2026
Applicant:
Angeline Trejo
Description:
LUMEN PROPOSED ACCESS EXISTING HH FOR SPLICING & INSTALL A NEW HH, VIA BORE.
Permit Reviews
Permit Number - TR-UTL-0726-01178
Permit Status: Issued
Permit Description: LUMEN PROPOSED ACCESS EXISTING HH FOR SPLICING & INSTALL A NEW HH, VIA BORE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2026 | RIGHT-OF-WAY REVIEW v.3 | 07/29/2026 | APPROVED |
| 07/24/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/28/2026 | REQUIRES RESUBMIT |
| 07/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/21/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01178
Permit Status: Issued
Permit Description: LUMEN PROPOSED ACCESS EXISTING HH FOR SPLICING & INSTALL A NEW HH, VIA BORE.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 07/20/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/20/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 07/20/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/20/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/29/2026 | |
| 07/29/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |