Permit: TR-UTL-0726-01171
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
6306 E FORDHAM DR
Address NEW:
6306 E FORDHAM DR
Apply Date:
07/15/2026
Applicant:
ANGEL MORALES
Description:
P.356692B Overbuild Bore 390' and trench 8' to place conduit and fiber cable Place 2183' of aerial fiber cable Place 1 hand hole
Permit Reviews
Permit Number - TR-UTL-0726-01171
Permit Status: Needs resubmittal
Permit Description: P.356692B Overbuild
Bore 390' and trench 8' to place conduit and fiber cable
Place 2183' of aerial fiber cable
Place 1 hand hole
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/15/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/10/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01171
Permit Status: Needs resubmittal
Permit Description: P.356692B Overbuild
Bore 390' and trench 8' to place conduit and fiber cable
Place 2183' of aerial fiber cable
Place 1 hand hole
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 07/16/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 07/16/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/16/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/16/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/16/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/16/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/10/2026 | Excavation - All excavations shall be secured for safety at the end of each shift. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet must be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift |
| 08/10/2026 | Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 08/10/2026 | The sidewalk shall remain open and ADA compliant at all times during construction. Worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented prior to sidewalk closure. |