Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1050 E 19TH ST
Address NEW:
1050 E 19TH ST
Apply Date:
07/15/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing a 4" Fire Protection Service

Permit Reviews

Permit Number - TR-UTL-0726-01168
Permit Status: Inspections
Permit Description: Installing a 4" Fire Protection Service
Start Date Submittal Complete Date Status  
07/15/2026 RIGHT-OF-WAY REVIEW v.1 07/21/2026 REQUIRES RESUBMIT Review Details
07/21/2026 RIGHT-OF-WAY REVIEW v.2 07/22/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01168
Permit Status: Inspections
Permit Description: Installing a 4" Fire Protection Service
Total Outstanding Activity Conditions - 4
Date Name
07/16/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
07/16/2026 S Santa Rita Av is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting.
07/16/2026 Traffic Control set-up approved between 7AM - 5PM
07/22/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0726-01168
Permite Description: Installing a 4" Fire Protection Service
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Final N/A Requested

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0726-01168
Permit Description: Installing a 4" Fire Protection Service
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/14/2026 TRSP - ROW - Barricade - Setup/Routine Passed
09/14/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
09/14/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed