Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
6355 S FONTANA AV
Apply Date:
07/15/2026
Applicant:
Cox Communications
Description:
PRJ318961-1 Cox to bore 143' for CATV system tie

Permit Reviews

Permit Number - TR-UTL-0726-01167
Permit Status: Inspections complete
Permit Description: PRJ318961-1 Cox to bore 143' for CATV system tie
Start Date Submittal Complete Date Status  
07/15/2026 RIGHT-OF-WAY REVIEW v.1 08/03/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01167
Permit Status: Inspections complete
Permit Description: PRJ318961-1 Cox to bore 143' for CATV system tie
Total Outstanding Activity Conditions - 5
Date Name
07/16/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
07/16/2026 Traffic control set-up approved between 9AM - 3:30PM
07/16/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/16/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/16/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TR-UTL-0726-01167
Permit Description: PRJ318961-1 Cox to bore 143' for CATV system tie
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/22/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/06/2026 TRSP - ROW - Barricade - Setup/Routine Passed
10/06/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
10/06/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW