Permit: TR-UTL-0726-01163
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
307 E VALENCIA RD
Address NEW:
307 E VALENCIA RD
Apply Date:
07/15/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 307 E VALENCIA RD
Permit Reviews
Permit Number - TR-UTL-0726-01163
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 307 E VALENCIA RD
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/04/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/05/2026 | APPROVED |
| 07/15/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/22/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01163
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 307 E VALENCIA RD
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/15/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/15/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/05/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 08/05/2026 | Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post. |
| 08/05/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0726-01163
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 307 E VALENCIA RD
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |