Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Withdrawn
Type:
Right-of-Way (ROW) - Utility
Address:
619 E 6TH ST
Address NEW:
619 E 6TH ST
Apply Date:
07/14/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 3'X2' TRENCH IN DIRT ROW AND REMOVE 1 SIDEWALK PANEL IN ORDER TO REPLACE GAS SERVICE **PLEASE OTE WORK HAS STARTED ** 08/07/26- Per customer request withdrawn permit.

Permit Reviews

Permit Number - TR-UTL-0726-01156
Permit Status: Withdrawn
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 3'X2' TRENCH IN DIRT ROW AND REMOVE 1 SIDEWALK PANEL IN ORDER TO REPLACE GAS SERVICE **PLEASE OTE WORK HAS STARTED ** 08/07/26- Per customer request withdrawn permit.
Start Date Submittal Complete Date Status  
07/15/2026 RIGHT-OF-WAY REVIEW v.1 07/24/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01156
Permit Status: Withdrawn
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 3'X2' TRENCH IN DIRT ROW AND REMOVE 1 SIDEWALK PANEL IN ORDER TO REPLACE GAS SERVICE **PLEASE OTE WORK HAS STARTED ** 08/07/26- Per customer request withdrawn permit.
Total Outstanding Activity Conditions - 6
Date Name
07/16/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
07/16/2026 Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
07/16/2026 Traffic control set-up approved between 9AM - 3:30PM
07/16/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/16/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/16/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.