Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4160 N 1ST AV
Address NEW:
4160 N 1ST AV
Apply Date:
07/14/2026
Applicant:
Brittany West
Description:
Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults. 10/12/2026 - Request for 30 Day Renewal as of 10/18/2026

Permit Reviews

Permit Number - TR-UTL-0726-01152
Permit Status: Inspections
Permit Description: Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults. 10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
Start Date Submittal Complete Date Status  
08/07/2026 RIGHT-OF-WAY REVIEW v.2 08/14/2026 APPROVED Review Details
07/14/2026 RIGHT-OF-WAY REVIEW v.1 08/05/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01152
Permit Status: Inspections
Permit Description: Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults. 10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
Total Outstanding Activity Conditions - 7
Date Name
07/15/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
07/15/2026 Traffic control set-up approved between 9AM - 3:30PM
07/15/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/15/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online
07/15/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
08/14/2026 The sidewalk shall remain open and ADA compliant at all times during construction. Crew or Worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented prior to sidewalk closure. Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices.
08/14/2026 Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0726-01152
Permite Description: Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults. 10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/16/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
TRSP - ROW - Final N/A Requested

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0726-01152
Permit Description: Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults. 10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/16/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed pre-pre-con held but they need their other permit for the second half of this going south
10/16/2026 TRSP - ROW - AERIAL INSTALLATION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
JB0002316999_PERMIT MAP_V1.PDF DOCUMENTS VIEW
TCP 1.0_V1.PDF DOCUMENTS VIEW
TCP 2_V1.PDF DOCUMENTS VIEW
TCP 3_V1.PDF DOCUMENTS VIEW