Permit: TR-UTL-0726-01152
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4160 N 1ST AV
Address NEW:
4160 N 1ST AV
Apply Date:
07/14/2026
Applicant:
Brittany West
Description:
Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults. 10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
Permit Reviews
Permit Number - TR-UTL-0726-01152
Permit Status: Inspections
Permit Description: Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults.
10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/07/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/14/2026 | APPROVED |
| 07/14/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/05/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01152
Permit Status: Inspections
Permit Description: Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults.
10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 07/15/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/15/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/15/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/15/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online |
| 07/15/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/14/2026 | The sidewalk shall remain open and ADA compliant at all times during construction. Crew or Worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented prior to sidewalk closure. Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 08/14/2026 | Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0726-01152
Permite Description: Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults.
10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| TRSP - ROW - Final | N/A | Requested |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0726-01152
Permit Description: Installing 2,625' of new strand and 432 CT fiber. Overlash 4,840' of new 432 CT fber. Install 975' of 2-2" conduits at a depth of 36" and installing 3 vaults.
10/12/2026 - Request for 30 Day Renewal as of 10/18/2026
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-pre-con held but they need their other permit for the second half of this going south | |
| 10/16/2026 | TRSP - ROW - AERIAL INSTALLATION | Passed |