Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Apply Date:
07/13/2026
Applicant:
Rene Villalobos
Description:
wo3271952 5426 e san francisco bl 13 14 35 ne replace hydrant east side of lot at se corner of sydney bl and san francisco bl in dirt 6LF/sc

Permit Reviews

Permit Number - TR-UTL-0726-01151
Permit Status: Issued
Permit Description: wo3271952 5426 e san francisco bl 13 14 35 ne replace hydrant east side of lot at se corner of sydney bl and san francisco bl in dirt 6LF/sc
Start Date Submittal Complete Date Status  
07/14/2026 RIGHT-OF-WAY REVIEW v.1 07/21/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01151
Permit Status: Issued
Permit Description: wo3271952 5426 e san francisco bl 13 14 35 ne replace hydrant east side of lot at se corner of sydney bl and san francisco bl in dirt 6LF/sc
Total Outstanding Activity Conditions - 4
Date Name
07/14/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
07/14/2026 Traffic Control set-up approved between 7AM - 5PM
07/21/2026 - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
07/21/2026 E San Fransisco Bl & N Sydney Av is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
5426 E SAN FRANCISCO BL_SKETCH_V1.PDF DOCUMENTS VIEW