Permit: TR-UTL-0726-01142
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5917 E 3RD ST
Address NEW:
5917 E 3RD ST
Apply Date:
07/13/2026
Applicant:
Tucson Water
Description:
5917 e 3rd st 14 14 12 se service repair front south side of lot in dirt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0726-01142
Permit Status: Complete
Permit Description: 5917 e 3rd st 14 14 12 se service repair front south side of lot in dirt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/03/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01142
Permit Status: Complete
Permit Description: 5917 e 3rd st 14 14 12 se service repair front south side of lot in dirt 6LF/sc
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 07/14/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/14/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/14/2026 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0726-01142
Permite Description: 5917 e 3rd st 14 14 12 se service repair front south side of lot in dirt 6LF/sc
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Deferred |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0726-01142
Permit Description: 5917 e 3rd st 14 14 12 se service repair front south side of lot in dirt 6LF/sc
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/24/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/24/2026 | TRSP - ROW - Final | Passed |