Permit: TR-UTL-0726-01140
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9319 E 30TH ST
Address NEW:
9319 E 30TH ST
Apply Date:
07/10/2026
Applicant:
Description:
wo3262969 9319 e 30th st 14-15-22 se replace hydrant west side of lot in dirt area 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0726-01140
Permit Status: Complete
Permit Description: wo3262969 9319 e 30th st 14-15-22 se replace hydrant west side of lot in dirt area 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/03/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01140
Permit Status: Complete
Permit Description: wo3262969 9319 e 30th st 14-15-22 se replace hydrant west side of lot in dirt area 6LF/sc
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/13/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/13/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/13/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 08/03/2026 | All excavations shall be secured for safety at the end of each shift. |
| 08/03/2026 | S CATHY AV & E 30TH are subject to a pavement moratorium. Any pavement disturbance will be subject to a 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0726-01140
Permit Description: wo3262969 9319 e 30th st 14-15-22 se replace hydrant west side of lot in dirt area 6LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Job is completed, traffic control devices have been removed from site | |
| 10/05/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no pre-con meeting held, new hydrant has been installed | |
| 10/05/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | New hydrant has been installed and backfilled in landscape beauty strip area with compaction. | |
| 10/05/2026 | TRSP - ROW - Final | Passed | hydrant installation with backfill and compaction has been completed, job site is clear of all traffic control devices, all work approved |