Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
850 E SENECA ST
Address NEW:
850 E SENECA ST
Apply Date:
07/10/2026
Applicant:
Rene Villalobos
Description:
wo#3323072 850 e seneca st 14 14 06 nw install water service east side of lot in dirt and asphalt 10LF/sc

Permit Reviews

Permit Number - TR-UTL-0726-01139
Permit Status: Needs resubmittal
Permit Description: wo#3323072 850 e seneca st 14 14 06 nw install water service east side of lot in dirt and asphalt 10LF/sc
Start Date Submittal Complete Date Status  
07/13/2026 RIGHT-OF-WAY REVIEW v.1 07/28/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01139
Permit Status: Needs resubmittal
Permit Description: wo#3323072 850 e seneca st 14 14 06 nw install water service east side of lot in dirt and asphalt 10LF/sc
Total Outstanding Activity Conditions - 4
Date Name
07/13/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/13/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/13/2026 Traffic Control set-up approved between 7AM - 5PM
07/13/2026 ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.