Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
510 S COUNTRY CLUB RD
Apply Date:
07/10/2026
Applicant:
ANGEL MORALES
Description:
P.358405 Overbuild Bore 334' and trench 50' to place conduit and fiber cable Place 4257' of aerial fiber cable Place 5 pedestals/cabinets/vaults

Permit Reviews

Permit Number - TR-UTL-0726-01138
Permit Status: Needs resubmittal
Permit Description: P.358405 Overbuild Bore 334' and trench 50' to place conduit and fiber cable Place 4257' of aerial fiber cable Place 5 pedestals/cabinets/vaults
Start Date Submittal Complete Date Status  
07/10/2026 RIGHT-OF-WAY REVIEW v.1 08/06/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01138
Permit Status: Needs resubmittal
Permit Description: P.358405 Overbuild Bore 334' and trench 50' to place conduit and fiber cable Place 4257' of aerial fiber cable Place 5 pedestals/cabinets/vaults
Total Outstanding Activity Conditions - 7
Date Name
07/15/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
07/15/2026 Traffic control set-up approved between 9AM - 3:30PM
07/15/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/15/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
07/15/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/15/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/15/2026 Please go to attachments for conditions on storm to shade.