Permit: TR-UTL-0726-01133
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
3938 E SPEEDWAY BL
Address NEW:
3938 E SPEEDWAY BL
Apply Date:
07/09/2026
Applicant:
Antonio Lopez - National Barricade Company
Description:
PRJ318400-1: Cox to pull thru 46' of existing CATV fiber & trench 5' to install new CATV fiber for system tie.
Permit Reviews
Permit Number - TR-UTL-0726-01133
Permit Status: Fees due
Permit Description: PRJ318400-1: Cox to pull thru 46' of existing CATV fiber & trench 5' to install new CATV fiber for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/23/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01133
Permit Status: Fees due
Permit Description: PRJ318400-1: Cox to pull thru 46' of existing CATV fiber & trench 5' to install new CATV fiber for system tie.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 07/14/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 07/14/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 07/14/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/14/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/23/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 07/23/2026 | Standard Comments – Recent Review Process Updates The following information is required for all permits submitted under the updated City review process: 1. Permit Application: Include the total number of Active ROW (Right-of-Way) impact days for each closure type and location (e.g., right lane, left lane, bike lane, sidewalk, turn bay, etc.). 2. Permit Application / Design Plans: When pavement cuts are proposed, identify the total square yardage of pavement cuts in the Work Detail section of the permit application and on the applicable design, site, or construction plans. 3. Traffic Control Plan (TCP): The TCP shall include: o Total number of Active ROW impact work days. o Total closure length, including: Taper length Buffer space length Work area length Return taper length Bike Lane closure length if different than overall TC closure Pedestrian Detour Route – if different than overall TC closure Plan to call out all Bus Stops and how they are address with in TC closure o Approved work hours based on the applicable ROW closure type. o All other required traffic control details and work area information necessary to clearly define the proposed impacts. Note: This information shall be included with all permit applications moving forward to comply with the City's updated review process and current Permit Fee Schedule. |