Permit: TR-UTL-0726-01111
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
842 E 9TH ST
Address NEW:
842 E 9TH ST
Apply Date:
07/07/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE CO WILL NEED EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD ALONG WITH (1) 25X3 TRECNH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 842 E 9TH ST
Permit Reviews
Permit Number - TR-UTL-0726-01111
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE CO WILL NEED EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD ALONG WITH (1) 25X3 TRECNH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 842 E 9TH ST
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/08/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/15/2026 | REQUIRES RESUBMIT |
| 07/21/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01111
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE CO WILL NEED EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD ALONG WITH (1) 25X3 TRECNH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 842 E 9TH ST
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/08/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 07/08/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/08/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/08/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/24/2026 | Refer to Attachments for Loss of Use and Loss of Value Estimates for scope of work |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0726-01111
Permit Description: ARIZONA PIPELINE CO WILL NEED EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD ALONG WITH (1) 25X3 TRECNH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 842 E 9TH ST
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |