Permit: TR-UTL-0726-01101
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
6250 E 32ND ST
Address NEW:
6250 E 32ND ST
Apply Date:
07/06/2026
Applicant:
ANGEL MORALES
Description:
P.356691D Overbuild Trench 54' to place conduit and fiber cable Place 4252' of aerial fiber cable Place 2 pedestals, 1 handhole
Permit Reviews
Permit Number - TR-UTL-0726-01101
Permit Status: Needs resubmittal
Permit Description: P.356691D Overbuild
Trench 54' to place conduit and fiber cable
Place 4252' of aerial fiber cable
Place 2 pedestals, 1 handhole
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/06/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/16/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01101
Permit Status: Needs resubmittal
Permit Description: P.356691D Overbuild
Trench 54' to place conduit and fiber cable
Place 4252' of aerial fiber cable
Place 2 pedestals, 1 handhole
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 07/07/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 07/07/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/07/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/07/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/07/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 07/07/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/07/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |