Permit: TR-UTL-0726-01097
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
6302 E CALLE PEGASO
Address NEW:
6302 E CALLE PEGASO
Apply Date:
07/06/2026
Applicant:
ANGEL MORALES
Description:
P.356691A Overbuild Bore 191' and trench 45' to place conduit and fiber cable Place 3933' of aerial fiber cable Place 1 pedestal and 1 hand hole
Permit Reviews
Permit Number - TR-UTL-0726-01097
Permit Status: Fees due
Permit Description: P.356691A Overbuild
Bore 191' and trench 45' to place conduit and fiber cable
Place 3933' of aerial fiber cable
Place 1 pedestal and 1 hand hole
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/06/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/15/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01097
Permit Status: Fees due
Permit Description: P.356691A Overbuild
Bore 191' and trench 45' to place conduit and fiber cable
Place 3933' of aerial fiber cable
Place 1 pedestal and 1 hand hole
Total Outstanding Activity Conditions - 11
| Date | Name |
|---|---|
| 07/07/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 07/07/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/07/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/07/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/07/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 07/07/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/07/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/15/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 07/15/2026 | Pedestrian Assistance -Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 07/15/2026 | Survey Monument – If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
| 07/15/2026 | Traffic Control Devices - Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |