Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3704 S MARVIN PL
Address NEW:
3704 S MARVIN PL
Apply Date:
07/01/2026
Applicant:
Cox Communications
Description:
Cox to trench 16' and bore 92' to install new CATV conduit for service repair order

Permit Reviews

Permit Number - TR-UTL-0726-01087
Permit Status: Complete
Permit Description: Cox to trench 16' and bore 92' to install new CATV conduit for service repair order
Start Date Submittal Complete Date Status  
07/01/2026 RIGHT-OF-WAY REVIEW v.1 08/03/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01087
Permit Status: Complete
Permit Description: Cox to trench 16' and bore 92' to install new CATV conduit for service repair order
Total Outstanding Activity Conditions - 5
Date Name
07/06/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
07/06/2026 Traffic Control set-up approved between 7AM - 5PM
07/06/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/06/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/06/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0726-01087
Permit Description: Cox to trench 16' and bore 92' to install new CATV conduit for service repair order
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/08/2026 TRSP - ROW - Barricade - Setup/Routine Passed work area will not require all closure, as there is enough room between trench route and trash pick up route
10/08/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed no pre-con meeting held, job has started
10/12/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
10/12/2026 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PRJ318443-1 TCP_V1.PDF DOCUMENTS VIEW
PRJ318443-1 TUCSON_V1.PDF DOCUMENTS VIEW