Permit: TR-UTL-0726-01086
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
2807 E 22ND ST
Address NEW:
2807 E 22ND ST
Apply Date:
07/01/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
T178667 - Treat Ave. from 22nd St to 17th St, TEP will be replacing 15 poles, install 3 new poles, and 2 new Poly Pedestals in the ROW. TEP will also be replacing existing overhead wire.
Permit Reviews
Permit Number - TR-UTL-0726-01086
Permit Status: Issued
Permit Description: T178667 - Treat Ave. from 22nd St to 17th St, TEP will be replacing 15 poles, install 3 new poles, and 2 new Poly Pedestals in the ROW. TEP will also be replacing existing overhead wire.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/16/2026 | RIGHT-OF-WAY REVIEW v.2 | 07/16/2026 | REQUIRES RESUBMIT |
| 07/17/2026 | RIGHT-OF-WAY REVIEW v.3 | 07/22/2026 | REQUIRES RESUBMIT |
| 07/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/15/2026 | REQUIRES RESUBMIT |
| 07/23/2026 | RIGHT-OF-WAY REVIEW v.4 | 07/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01086
Permit Status: Issued
Permit Description: T178667 - Treat Ave. from 22nd St to 17th St, TEP will be replacing 15 poles, install 3 new poles, and 2 new Poly Pedestals in the ROW. TEP will also be replacing existing overhead wire.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 07/06/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/06/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/06/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/06/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/28/2026 | - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 07/28/2026 | Equipment or poles shall not be stored unattended within the ROW without approved barricades and safety delineation. Equipment or Poles left overnight or for extended periods must be properly secured and protected to prevent hazards to pedestrians, bicyclists, and vehicles. |
| 07/28/2026 | Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 07/28/2026 | No pedestrian detour is proposed. Therefore, the sidewalk shall remain open and ADA compliant at all times during construction. Worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented prior to sidewalk closure. |