Permit: TR-UTL-0726-01085
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4251 N LIMBERLOST PL
Address NEW:
4251 N LIMBERLOST PL
Apply Date:
07/01/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 40X2 TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE FOR 4251 N LIMBERLOST PL
Permit Reviews
Permit Number - TR-UTL-0726-01085
Permit Status: Complete
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 40X2 TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE FOR 4251 N LIMBERLOST PL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/15/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0726-01085
Permit Status: Complete
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 40X2 TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE FOR 4251 N LIMBERLOST PL
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 07/01/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 07/01/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 07/01/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/01/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/15/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 07/15/2026 | Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 07/15/2026 | N Neffson Dr is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0726-01085
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 40X2 TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE FOR 4251 N LIMBERLOST PL
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | all work to be done in the dirt right away none in the roadway or asphalt | |
| 08/17/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | No photos of the barricade set up. I was informed that this was only done in one day still needs to be verified. by the barricade Company, my side of this is done all work complete barricades have been removed. | |
| 08/17/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | No photos of the barricade set up. I was informed that this was only done in one day still needs to be verified. by the barricade Company, my side of this is done all work complete barricades have been removed. | |
| 08/17/2026 | TRSP - ROW - Final | Passed | See photos all devices have been removed. All work was done in the dirt right away and has been completed. They informed me they did this all in one day. |