Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4251 N LIMBERLOST PL
Apply Date:
07/01/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 40X2 TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE FOR 4251 N LIMBERLOST PL

Permit Reviews

Permit Number - TR-UTL-0726-01085
Permit Status: Complete
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 40X2 TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE FOR 4251 N LIMBERLOST PL
Start Date Submittal Complete Date Status  
07/01/2026 RIGHT-OF-WAY REVIEW v.1 07/15/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0726-01085
Permit Status: Complete
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 40X2 TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE FOR 4251 N LIMBERLOST PL
Total Outstanding Activity Conditions - 7
Date Name
07/01/2026 Traffic Control set-up approved between 7AM - 5PM
07/01/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/01/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/01/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/15/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
07/15/2026 Lane closures and street closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk.
07/15/2026 N Neffson Dr is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0726-01085
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 40X2 TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE FOR 4251 N LIMBERLOST PL
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/21/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed all work to be done in the dirt right away none in the roadway or asphalt
08/17/2026 TRSP - ROW - Barricade - Setup/Routine Passed No photos of the barricade set up. I was informed that this was only done in one day still needs to be verified. by the barricade Company, my side of this is done all work complete barricades have been removed.
08/17/2026 TRSP - ROW - Backfill - Placement/Compaction Passed No photos of the barricade set up. I was informed that this was only done in one day still needs to be verified. by the barricade Company, my side of this is done all work complete barricades have been removed.
08/17/2026 TRSP - ROW - Final Passed See photos all devices have been removed. All work was done in the dirt right away and has been completed. They informed me they did this all in one day.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
4251 N LIMBERLOST PL SITE_V1.PDF DOCUMENTS VIEW
4251 N LIMBERLOST PL TCP_V1.PDF DOCUMENTS VIEW