Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3003 S MISSION RD
Apply Date:
07/31/2025
Applicant:
Ilana Galluzzo
Description:
4' x 25' BELL HOLE IN CONCRETE/PAVEMENT TO INSTALL NEW GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-0725-01238
Permit Status: Complete
Permit Description: 4' x 25' BELL HOLE IN CONCRETE/PAVEMENT TO INSTALL NEW GAS SERVICE
Start Date Submittal Complete Date Status  
07/31/2025 RIGHT-OF-WAY REVIEW v.1 08/01/2025 REQUIRES RESUBMIT Review Details
08/12/2025 RIGHT-OF-WAY REVIEW v.2 08/13/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0725-01238
Permit Status: Complete
Permit Description: 4' x 25' BELL HOLE IN CONCRETE/PAVEMENT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 4
Date Name
07/31/2025 Traffic control set-up approved between 9AM - 3:30PM
07/31/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/12/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
08/12/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01238
Permit Description: 4' x 25' BELL HOLE IN CONCRETE/PAVEMENT TO INSTALL NEW GAS SERVICE
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/18/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/17/2025 TRSP - ROW - Bituminous Treatment Passed
10/21/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/21/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
10/22/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
3003 S MISSION RD 4997503_V1.PDF DOCUMENTS VIEW
3003 S MISSION RD REVISED TCP_V2.PDF DOCUMENTS VIEW