Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
5570 S MISSIONDALE RD
Apply Date:
07/30/2025
Applicant:
Tucson Electric Power
Description:
WO T143467 - TEP CREWS TO PARK IN THE CITY OF TUCSON RIGHT-OF-WAY TO PERFORM OVERHEAD WORK ON THE WEST SIDE OF MISSIONDALE, TO REPLACE 2 POLES IN LINE WITH EXISITING POWER LINE 10/29/25 - Request for 90 Day Renewal as of 11/02/2025 new expiration date 2/2/2026

Permit Reviews

Permit Number - TR-UTL-0725-01224
Permit Status: Complete
Permit Description: WO T143467 - TEP CREWS TO PARK IN THE CITY OF TUCSON RIGHT-OF-WAY TO PERFORM OVERHEAD WORK ON THE WEST SIDE OF MISSIONDALE, TO REPLACE 2 POLES IN LINE WITH EXISITING POWER LINE 10/29/25 - Request for 90 Day Renewal as of 11/02/2025 new expiration date 2/2/2026
Start Date Submittal Complete Date Status  
07/30/2025 RIGHT-OF-WAY REVIEW v.1 07/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0725-01224
Permit Status: Complete
Permit Description: WO T143467 - TEP CREWS TO PARK IN THE CITY OF TUCSON RIGHT-OF-WAY TO PERFORM OVERHEAD WORK ON THE WEST SIDE OF MISSIONDALE, TO REPLACE 2 POLES IN LINE WITH EXISITING POWER LINE 10/29/25 - Request for 90 Day Renewal as of 11/02/2025 new expiration date 2/2/2026
Total Outstanding Activity Conditions - 2
Date Name
07/30/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
07/30/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01224
Permit Description: WO T143467 - TEP CREWS TO PARK IN THE CITY OF TUCSON RIGHT-OF-WAY TO PERFORM OVERHEAD WORK ON THE WEST SIDE OF MISSIONDALE, TO REPLACE 2 POLES IN LINE WITH EXISITING POWER LINE 10/29/25 - Request for 90 Day Renewal as of 11/02/2025 new expiration date 2/2/2026
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/28/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
10/28/2025 TRSP - ROW - Final Passed
10/28/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
AERIAL MAP_V1.PDF DOCUMENTS VIEW