Permit: TR-UTL-0725-01217
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3970 N FLOWING WELLS RD
Address NEW:
3970 N FLOWING WELLS RD
Apply Date:
07/28/2025
Applicant:
John Rhodes
Description:
Tie point will be existing Comcast plant on pole. Overlash 150' of .625 coax on existing strand. Place 150' of new strand and lash 150' of .625 coax. Place new riser. Bore 400' of 2" conduit at a depth of 3'. Run 400' of .625 coax. Place new pedestal. Trench 200' of 2" conduit at a depth of 3'. Run 200' of .625 coax.
Permit Reviews
Permit Number - TR-UTL-0725-01217
Permit Status: Complete
Permit Description: Tie point will be existing Comcast plant on pole. Overlash 150' of .625 coax on existing strand. Place 150' of new strand and lash 150' of .625 coax. Place new riser. Bore 400' of 2" conduit at a depth of 3'. Run 400' of .625 coax. Place new pedestal. Trench 200' of 2" conduit at a depth of 3'. Run 200' of .625 coax.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/29/2025 | REQUIRES RESUBMIT |
| 07/29/2025 | RIGHT-OF-WAY REVIEW v.2 | 07/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01217
Permit Status: Complete
Permit Description: Tie point will be existing Comcast plant on pole. Overlash 150' of .625 coax on existing strand. Place 150' of new strand and lash 150' of .625 coax. Place new riser. Bore 400' of 2" conduit at a depth of 3'. Run 400' of .625 coax. Place new pedestal. Trench 200' of 2" conduit at a depth of 3'. Run 200' of .625 coax.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/29/2025 | LOCAL street Pavement Moratorium |
| 07/29/2025 | MULTIPLE JURISDICTION |
| 07/29/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 07/29/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0725-01217
Permit Description: Tie point will be existing Comcast plant on pole. Overlash 150' of .625 coax on existing strand. Place 150' of new strand and lash 150' of .625 coax. Place new riser. Bore 400' of 2" conduit at a depth of 3'. Run 400' of .625 coax. Place new pedestal. Trench 200' of 2" conduit at a depth of 3'. Run 200' of .625 coax.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/20/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/20/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 08/20/2025 | TRSP - ROW - Final | Passed |