Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2480 N PANTANO RD
Apply Date:
07/28/2025
Applicant:
John Rhodes
Description:
Tie point will be existing splice case inside existing cabinet. Bore 80' of 2" conduit at a depth of 3', run 80' of 48ct fiber. Trench 315' of 2" conduit at a depth of 3', run 315' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Trench 70' of 2" conduit at a depth of 3', run 70' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Bore 170' of 2" conduit at a depth of 3', run 170' of 48ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3', run 700' of 48ct fiber.

Permit Reviews

Permit Number - TR-UTL-0725-01216
Permit Status: Complete
Permit Description: Tie point will be existing splice case inside existing cabinet. Bore 80' of 2" conduit at a depth of 3', run 80' of 48ct fiber. Trench 315' of 2" conduit at a depth of 3', run 315' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Trench 70' of 2" conduit at a depth of 3', run 70' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Bore 170' of 2" conduit at a depth of 3', run 170' of 48ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3', run 700' of 48ct fiber.
Start Date Submittal Complete Date Status  
07/28/2025 RIGHT-OF-WAY REVIEW v.1 07/28/2025 REQUIRES RESUBMIT Review Details
07/28/2025 RIGHT-OF-WAY REVIEW v.1 07/28/2025 REQUIRES RESUBMIT Review Details
07/29/2025 RIGHT-OF-WAY REVIEW v.2 07/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0725-01216
Permit Status: Complete
Permit Description: Tie point will be existing splice case inside existing cabinet. Bore 80' of 2" conduit at a depth of 3', run 80' of 48ct fiber. Trench 315' of 2" conduit at a depth of 3', run 315' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Trench 70' of 2" conduit at a depth of 3', run 70' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Bore 170' of 2" conduit at a depth of 3', run 170' of 48ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3', run 700' of 48ct fiber.
Total Outstanding Activity Conditions - 2
Date Name
07/29/2025 PRE-CON/PAVEMENT/SIDEWALK
07/29/2025 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01216
Permite Description: Tie point will be existing splice case inside existing cabinet. Bore 80' of 2" conduit at a depth of 3', run 80' of 48ct fiber. Trench 315' of 2" conduit at a depth of 3', run 315' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Trench 70' of 2" conduit at a depth of 3', run 70' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Bore 170' of 2" conduit at a depth of 3', run 170' of 48ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3', run 700' of 48ct fiber.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
08/29/2025 TRSP - ROW - Barricade - Setup/Routine N/A Re-inspection required
08/29/2025 TRSP - ROW - Barricade Takedown N/A Re-inspection required
08/29/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
08/29/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01216
Permit Description: Tie point will be existing splice case inside existing cabinet. Bore 80' of 2" conduit at a depth of 3', run 80' of 48ct fiber. Trench 315' of 2" conduit at a depth of 3', run 315' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Trench 70' of 2" conduit at a depth of 3', run 70' of 48ct fiber. Bore 60' of 2" conduit at a depth of 3', run 60' of 48ct fiber. Bore 170' of 2" conduit at a depth of 3', run 170' of 48ct fiber. Place new vault. Bore 700' of 2" conduit at a depth of 3', run 700' of 48ct fiber.
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/29/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/07/2026 TRSP - ROW - Barricade - Setup/Routine Passed
01/07/2026 TRSP - ROW - Barricade Takedown Passed
01/07/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
01/07/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
ENGINEERING DRAFT_V1.PDF DOCUMENTS VIEW
TCP_V1.PDF DOCUMENTS VIEW