Permit: TR-UTL-0725-01169
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8900 E 29TH ST
Address NEW:
8900 E 29TH ST
Apply Date:
07/21/2025
Applicant:
luis granillo
Description:
Emergency main repair, 8900 e 29th st 14-15-22 sw, work order 308307, north side in asphalt, 6lf.ca
Permit Reviews
Permit Number - TR-UTL-0725-01169
Permit Status: Complete
Permit Description: Emergency main repair, 8900 e 29th st 14-15-22 sw, work order 308307, north side in asphalt, 6lf.ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/21/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01169
Permit Status: Complete
Permit Description: Emergency main repair, 8900 e 29th st 14-15-22 sw, work order 308307, north side in asphalt, 6lf.ca
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/21/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 07/22/2025 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0725-01169
Permit Description: Emergency main repair, 8900 e 29th st 14-15-22 sw, work order 308307, north side in asphalt, 6lf.ca
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work is complete, but no pre-activity meeting was ever requested. The entire subdivision has been repaved under proposition 411 | |
| 08/22/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete, but no backfill inspection was ever requested. The entire neighborhood has been repaved under prop 411 | |
| 08/22/2025 | TRSP - ROW - Final | Passed | Work was completed just prior to a full subdivision repaving through prop 411 |