Permit: TR-UTL-0725-01161
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3003 S MISSION RD
Address NEW:
3003 S MISSION RD
Apply Date:
07/18/2025
Applicant:
Description:
wo#3050811 3003 s mission rd 14-13-27 ne install new service front of lot in asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0725-01161
Permit Status: Complete
Permit Description: wo#3050811 3003 s mission rd 14-13-27 ne install new service front of lot in asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/20/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/22/2025 | REQUIRES RESUBMIT |
| 10/29/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/29/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01161
Permit Status: Complete
Permit Description: wo#3050811 3003 s mission rd 14-13-27 ne install new service front of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 07/22/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 07/22/2025 | Flood Use Permit Required - Scope of work located within flood zone. |
| 07/22/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/22/2025 | Vertical Message boards to be placed 5 days in advance of work at both ends of the project area |
| 07/22/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/29/2025 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0725-01161
Permit Description: wo#3050811 3003 s mission rd 14-13-27 ne install new service front of lot in asphalt 6LF/sc
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 11/04/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/04/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/04/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 11/04/2025 | TRSP - ROW - Bituminous Treatment | Passed | ||
| 11/04/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 11/04/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 11/04/2025 | TRSP - ROW - Drainage - Pipe Installation/Removal | Passed | ||
| 11/04/2025 | TRSP - ROW - Field Change Request | Passed | ||
| 11/06/2025 | TRSP - ROW - Final | Passed |