Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1210 E NAVAJO RD
Address NEW:
1210 E NAVAJO RD
Apply Date:
07/18/2025
Applicant:
Tucson Electric Power
Description:
WO T125279 - INSTALLING (2) NEW TEP POLES AND OVERHEAD SECONDARY 05/21/26- renew for 60 days as of 05/28/26. New expiration date is 07/27/26.

Permit Reviews

Permit Number - TR-UTL-0725-01156
Permit Status: Complete
Permit Description: WO T125279 - INSTALLING (2) NEW TEP POLES AND OVERHEAD SECONDARY 05/21/26- renew for 60 days as of 05/28/26. New expiration date is 07/27/26.
Start Date Submittal Complete Date Status  
02/25/2026 RIGHT-OF-WAY REVIEW v.2 02/25/2026 APPROVED Review Details
07/20/2025 RIGHT-OF-WAY REVIEW v.1 07/22/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0725-01156
Permit Status: Complete
Permit Description: WO T125279 - INSTALLING (2) NEW TEP POLES AND OVERHEAD SECONDARY 05/21/26- renew for 60 days as of 05/28/26. New expiration date is 07/27/26.
Total Outstanding Activity Conditions - 4
Date Name
07/21/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
07/21/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/21/2025 Submission of Traffic Control Plan will be required if scope of work impacts more than half the right of way.
07/21/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01156
Permit Description: WO T125279 - INSTALLING (2) NEW TEP POLES AND OVERHEAD SECONDARY 05/21/26- renew for 60 days as of 05/28/26. New expiration date is 07/27/26.
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/22/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed still continuing for work for pre-activity completed on the previous permit
07/28/2026 TRSP - ROW - Barricade - Setup/Routine Passed Work already complete completed inspection not needed barricades have been removed
07/28/2026 TRSP - ROW - AERIAL INSTALLATION Passed
07/28/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PERMIT MAP_V1.PDF DOCUMENTS VIEW