Permit: TR-UTL-0725-01149
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3055 N CAMPBELL AV UNIT 113
Address NEW:
3055 N CAMPBELL AV UNIT 113
Apply Date:
07/17/2025
Applicant:
JUAN PEREZ
Description:
Excavating a 12x2 trench to replace gas line service in row in dirt.
Permit Reviews
Permit Number - TR-UTL-0725-01149
Permit Status: Complete
Permit Description: Excavating a 12x2 trench to replace gas line service in row in dirt.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/25/2025 | RIGHT-OF-WAY REVIEW v.2 | 07/28/2025 | APPROVED |
| 07/17/2025 | RIGHT-OF-WAY REVIEW v.1 | 07/17/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0725-01149
Permit Status: Complete
Permit Description: Excavating a 12x2 trench to replace gas line service in row in dirt.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 07/28/2025 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 07/28/2025 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way |
| 07/28/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 07/28/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 07/28/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/28/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0725-01149
Permit Description: Excavating a 12x2 trench to replace gas line service in row in dirt.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 08/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/27/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 08/27/2025 | TRSP - ROW - Final | Passed |