Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5625 E 29TH ST
Address NEW:
5625 E 29TH ST
Apply Date:
07/15/2025
Applicant:
Description:
wo3040128 5625 e 29th st 14-14-24 nw install new service front south side of lot in asphalt 8LF/sc

Permit Reviews

Permit Number - TR-UTL-0725-01142
Permit Status: Complete
Permit Description: wo3040128 5625 e 29th st 14-14-24 nw install new service front south side of lot in asphalt 8LF/sc
Start Date Submittal Complete Date Status  
07/15/2025 RIGHT-OF-WAY REVIEW v.1 07/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0725-01142
Permit Status: Complete
Permit Description: wo3040128 5625 e 29th st 14-14-24 nw install new service front south side of lot in asphalt 8LF/sc
Total Outstanding Activity Conditions - 3
Date Name
07/16/2025 PRE-CON/PAVEMENT/SIDEWALK
07/16/2025 Traffic control set-up approved between 9AM - 3:30PM
07/16/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01142
Permite Description: wo3040128 5625 e 29th st 14-14-24 nw install new service front south side of lot in asphalt 8LF/sc
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/15/2025 TRSP - ROW - Final N/A Re-inspection required Work is complete and a temporary patch is in place. Waiting for final pavement repair.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0725-01142
Permit Description: wo3040128 5625 e 29th st 14-14-24 nw install new service front south side of lot in asphalt 8LF/sc
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/15/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete, but no pre-activity meeting was ever requested
08/15/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete, but no backfill inspection was ever requested
04/09/2026 TRSP - ROW - Final Passed permanent patch has been installed, all work completed

Documents

File Name Document Type  
5625 E 29TH ST_C SKETCH_V1.PDF DOCUMENTS VIEW
5625 E 29TH ST_TCP_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW